Tuesday, November 23, 2021

Arnstadt Roundhouse.

Roundhouse at Arnstadt, Germany. Went into operation in 1898, expanded to 22 stands, converted into a railway museum, and was renovated in 1994/95.













Friday, November 19, 2021

Thalys TGV Belgium.

 




MNNR.

The MNNR switching and terminal railroad operates out of the St. Paul area with service to Minneapolis, Bayport, Hugo, Fridley and New Brighton. It is based out of a roundhouse on Cleveland Ave. in St. Paul just blocks south of the former Amtrak station and the "A" Main Yard is just to the north of the station. Daily connections are made with BNSF, CP, UP, CN and TC&W. The line was originally the Minnesota Transfer Railroad, and was owned by the major railroads serving the Twin Cities area. The Minnesota Transfer was purchased by the Minnesota Commercial in 1987.



MNNR Rail Yard.


 

Thursday, November 11, 2021

METX 109, outbound from Chicago Union Station, meets an inbound train pushed by METX 414.





The British Rail Class 221 Super Voyager.

The British Rail Class 221 Super Voyager is a class of tilting diesel-electric multiple-unit express passenger trains built in Bruges, Belgium, by Bombardier Transportation in 2001/02.

The Class 221 are similar to the Class 220 Voyager units, but were built with a tilting mechanism enabling up to six degrees of tilt to allow higher speeds on curved tracks, most have five coaches, and they have a different bogie design. They have a maximum speed of 125 mph (200 km/h).

Currently these trains are divided between two operators, Avanti West Coast (20 sets) and CrossCountry (24 sets). The sets operated by CrossCountry had their tilt function disabled in 2008 to improve reliability and reduce maintenance costs.







Bombardier Transportation. ETR.400

 1.  Sight of the very first dry run of Zefiro V300 high speed train from Italy to Paris on August, 8th 2021.


2.  The Frecciarossa 1000, also known as the ETR 1000,[6] is a high-speed train operated by Italian state railway operator Trenitalia.



Newcastle upon Tyne, 1961.

 


Tuesday, November 9, 2021

Nottingham Victoria station, Great Central Railway.

The station was opened in 1900 and boasted 12 platforms, but was gradually run down during the 1960s.  It was demolished after closing in 1967 The station was opened in 1900 and boasted 12 platforms, but was gradually run down during the 1960s.

It was demolished after closing in 1967 with only the clock tower left standing.                                             

 1: Before closure.             2:  After closure.